Designation: D – 07Standard Guide for Painting Inspectors (Metal Substrates)1 This. Buy ASTM D GUIDE FOR PAINTING INSPECTORS (METAL SUBSTRATES) from SAI Global. ASTM D – Designation: D – 00 Standard Guide for Painting Inspectors (Metal Substrates.

Author: Kagore Shaktit
Country: Botswana
Language: English (Spanish)
Genre: Music
Published (Last): 3 November 2018
Pages: 217
PDF File Size: 8.47 Mb
ePub File Size: 14.62 Mb
ISBN: 235-6-95021-946-3
Downloads: 20481
Price: Free* [*Free Regsitration Required]
Uploader: Barg

The weight-per-gallon cup holds a given volume when? SSPC provides a detailed speci? If you need to be able to add standards to the monitoring service, you must register as a user with your own username and password. Read more about subscriptions.

Visual observation and touch 2. Abrasive, dirt, or other debris that becomes embedded in the paint? In addition, crevices and small cracks should be thoroughly cleaned and spot-primed. Commercial Grade Power Tool Cleaning.

Special attention should be placed on examining hard to reach areas, the back side of nuts and bolts, sides of members in close proximity to other members or walls, ast undersides of members.

The standard is used by the inspector to assist in determining whether the degree of surface preparation speci?

ASTM D – 07 Standard Guide for Painting Inspectors (Metal Substrates)

For large jobs it is recommended that before work starts, an actual steel sample of adequate size be blasted to the satisfaction of the project engineer.

After drying, the crevices and cracks can be? Note 1 – For additional helpful information, refer to the following documents: High voltage holiday detectors are capable of producing various voltage outputs.

  LOEWENSTEIN OCCUPATIONAL THERAPY COGNITIVE ASSESSMENT PDF

The various items are explained in detail in the text of this guide. The cross-cut test, Test Method Dis more reproducible.

ASTM D3276:15

IV V Surface Preparation: As the contents warm up, the excess escapes through the hole and is removed. Pinhole and holiday detectors are either low voltage or high voltage. The inspector should prohibit the use of any brush not in an acceptable condition. The equipment should be kept in a suitably clean condition to permit proper coating application without depositing dirt, dried coating, and other foreign materials in the?

The size is generally by mm 4 by 7 in.

During the inspection, also ensure that any oil or grease contamination that may have become deposited on the surface is completely removed. Proper roller technique requires application in the form of a V or W depending on the size of the area involved. Poor spray technique resulting in excessive overspray a sand-like? Dust and abrasive removal 2. The different instruments that can be used are described in this section.

The tungsten carbide cutting tip is specially shaped to slice a precise narrow groove through a? Equation shown in 6. They should not exceed 4 in. Record time application completed These include oil, grease, soil, weld spatter, and slag, that make it impossible to obtain proper adhesion to the metal surface. Attached to the cup is a looped handle with a small opening at the top to align the cup in a vertical position when withdrawing it from the liquid being tested.

Thinning is carried out by pouring about half of the thoroughly mixed coating into an empty, clean container. Roller covers are available in a variety of diameters, lengths, types of fabric, and? Brushes should be kept free of all materials that may clog the wires of d3267 brush. Recoat Times observed A checklist for use in the? The contaminants should be ast not simply spread out by a thorough wiping of the affected areas with cloths saturated with clean solvent.

  CATALOGO METAL LEVE BRONZINAS PDF

When surface preparation and painting are carried on awtm, overnight delays between coating and painting may be permissible except on blastcleaned surfaces. Referenced Documents purchase separately The documents listed below are referenced within the subject standard but are not provided as part of the standard.

The steel should remain under cover until the applied coating is dry or until weather conditions permit its exposure in the open.

The air sstm for conventional and hot spray application should be free of moisture or oil. A ground wire is attached to the bare substrate. It has a closely? The angularity sharpness and density of the pro?

Some coatings are considered dry for recoating when the next coat can be applied without the development of any detrimental? Application technique with a pad on large surface areas is similar to that used with a roller.

Film defects, voids, etc. Holiday testing is usually performed on coatings intended for immersion service.

Many materials if not removed from the surface will affect the life of the coating.